Worcester – Elmore VT Route 12 Corridor Project

Worcester – Elmore VT Route 12 Corridor Project, Worcester Bridges 84, 87, & 89 – Regional Concerns Meeting Notification

FOR IMMEDIATE RELEASE – January 8, 2021

Worcester, VT – A Public Informational Meeting on the projects listed below will be held on Monday, February 1, 2021 beginning at 6:30 PM during the regularly scheduled selectboard meeting via zoom. Directions with a link to the online zoom meeting can be found below and on the meeting agenda on the Town’s website prior to the meeting. The meeting will be held by the Vermont Agency of Transportation (VTrans) and Town of Worcester.

Join Zoom Meeting: https://us02web.zoom.us/j/7722544134

Meeting ID: 772 254 4134   |  phone: (646) 558-8656

Bridge replacement projects:

· Worcester BF 0241(59) – VT Route 12, Bridge 84 over the North Branch of Winooski River

· Worcester BF 0241(56) – VT Route 12, Bridge 87 over Hardwood Brook

· Worcester BF 0241(57) – VT Route 12, Bridge 89 over North Brook

The recommended alternative includes a full bridge replacement at each site with 1-way alternating traffic maintained via phased construction or a temporary bridge

The intent of the meeting is to provide an overview of these bridge replacement projects to Town Officials, local residents and businesses, emergency services and other interested parties. There will be a review of the existing site conditions, proposed work, and overall schedule followed by a question-and-answer period. Representatives from both VTrans and the Town of Worcester will be available at the meeting to address public concerns about the project.

Electronic copies of the Scoping Reports are available online at:

Worcester BF 0241(59): https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/86E053

Worcester BF 0241(56): https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/19B213

Worcester BF 0241(57): https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/19B214

Archives