Municipal Class 4 Road Erosion Remediation Project Workshops
OVERVIEW:
The primary objective of this project is to reduce sediment and phosphorus runoff by implementing road Best Management Practices (BMPs) on hydrologically-connected municipal road segments, specifically Class 4 roads, within the Lake Champlain watershed. Hydrologically-connected road segments are those sections of road at high risk to impact adjacent surface waters, lakes, ponds, perennial and intermittent streams, and wetlands. In addition to CVRPC’s Final Report on this project, the State has developed a hydrologically-connected road segment GIS layer that is available on the VT ANR Natural Resources Atlas – http://anr.vermont.gov/maps/nr-atlas. Secondary benefits of implementing road BMPs are improved flood resiliency and road safety. This project demonstrated the importance of municipalities addressing significant erosion sources from Class 4 roads.
BMPs implemented during the project include drainage and driveway culvert upgrades, turn out installations, culvert outlet stabilizations, culvert headwall stabilizations, grass and stone-lined drainage ditch installations, roadside berm removal, and road resurfacing. All of these practices promote road stormwater disconnection, infiltration and conveyance stability.
Two workshops highlighting the completed Municipal Class 4 Road Erosion Remediation and Demonstration Projects were held in late August. The workshops focused on the BMP utilized to address significant erosion sources from Class 4 roads, the cost and time expended for the specific BMP installed by road and segment, and how each road segment now meets the Municipal Roads General Permit standards. By sharing the project remediation and demonstration components and having a “lessons learned” discussion, other municipalities across the state will learn how to replicate the Class 4 erosion BMP. Site visits to the specific demonstration project areas helped to showcase the work that has been completed.
LESSONS LEARNED:
Many Class 4 roads have been minimally maintained for years with the occasional grading and/or maintenance of the culverts and bridges. CVRPC found many towns reluctant to work on these roads even with funding available. The reasons for their reluctance included other priority roadway projects to work on; Class 4 roads in town serve very few residents; off-road and 4 wheeler use would ruin the work; the remote erosion location would require upgrading the road in order to reach the area in need of fixing, costing more than fix itself.
This project’s success was at identifying locations where the town had a strong need or desire to have the roadway in better condition. For instance, Apple Hill in Calais is a short cut between two roads in Calais, providing a convenience for residents to reduce travel time and distance. Hancock Brook in Worcester is an emergency access to the north east part of town if Hampshire Hill Rd washes out. These and other reasons are why the sites were selected and work was performed by the towns.
BY THE NUMBERS:
28 Segments of road were addressed over 1.7 total miles in 4 towns.
Grant Award was $100,000 with a local match of $20,000 for a total construction value of $120,000.
Actuals as of 8/22/18: $72,131 municipal reimbursement from grant with local match of $18,033 for a total construction value of $90,164.
NOTE: All costs outlined are estimates and individual town costs may differ
*This project was funded with a grant from the Vermont Department of Environmental Conservation and the Lake Champlain Basin Program
Archives
- October 2024
- July 2024
- April 2024
- February 2024
- January 2024
- December 2023
- November 2023
- September 2023
- August 2023
- July 2023
- March 2023
- December 2022
- November 2022
- October 2022
- September 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
- February 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- April 2017
- March 2017
- February 2017
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- April 2016
- March 2016
- February 2016
- January 2016
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- December 2012
- November 2012
- October 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- March 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- August 2011
- July 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- September 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- June 2009
- May 2009
- April 2009
- March 2009
- February 2009
- January 2009
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008